Customized Waterproof Insulated Thermal Bag for Eats Delivery Food Grocery Thermal Lunch Bag Food Delivery Bag
Fast Front-Opening Access | Multi-Level Loading Shelves | Padded Backpack Straps and Dual Carry Handles | Custom Color, Logo and Interior Layout
- Overview
- Lime-Green Fleet OEM Customization
- Low 100-Piece MOQ for Fast-Food Fleets
- Reliable Sample & Mass Production Schedule
- Recommended Products








Name |
Customized waterproof Insulated Thermal Bag For Eats Delivery Food Grocery Thermal Lunch Bag Food Delivery Bag |
Material |
Tarpaulin |
Usage |
Keep food warm, keep drink cooler. |
Feature |
Durable, reusable, eco-friendly, convenient and portable |
Size |
Customized size available |
Color |
Pantone color available |
Logo |
Customized logo available |
MOQ |
100 Pieces |
Loading Port |
Xiamen, Fujian |
Delivery Time |
30-50 Days (depends on the quantity and style) |
Sample lead time |
5-7 working Days |
Packing |
1pc in a poly bag, 10 or 5pcs per carton |
Payment |
T/T, L/C,Western Union, etc. |







Comprehensive factory customization tailored to your on-demand food delivery operations: • Custom Size: Dimensions can be customized according to the specific items you need to carry (such as pizza boxes, drink cup holders, or takeaway containers). • Custom Capacity: Internal volume adjusted to match your daily order batch requirements. • Custom Color: Available in delivery lime green, all-weather black, bright orange, or custom Pantone brand hues. • Custom Logo: Your company logo can be printed on the bag (supports screen printing or heat transfer branding).
• Minimum Quantity: 100 pieces per batch for customized item sizing, tailored color matching, and custom printed logos. • Low-Risk Fleet Outfitting: Designed for food delivery apps, franchise restaurant chains, and courier cooperatives looking to equip riders with branded, high-visibility gear with minimal inventory overhead.
Structured manufacturing timelines backed by certified factory production capacity: • Sample Lead Time: 7–15 business days for tailored prototype sewing, rack buckle testing, and printed logo sign-off. • Bulk Production Lead Time: 30–35 business days following formal sample confirmation and deposit receipt. • Timely Fulfillment: Organized assembly lines guarantee on-time shipment to support your scheduled commercial fleet launch.


